What can you build in Truckee?
Factory-built homes and ADUs, planned around Truckee snow loads and set on your foundation. Building since 1984.
Homes are built indoors in Spanish Fork, Utah, then delivered and set on your lot. See what fits my lot
Built indoors. Set between storms.
Truckee is hard on site builds. Short seasons, heavy snow and scarce crews drive costs up and push schedules out. The town requires homes to carry ground snow loads from 170 to over 480 pounds per square foot, depending on the lot.
We build your home inside our 70,000 sq ft factory while your foundation and utilities go in. Each module passes 551 quality checks before it leaves. Then it’s delivered and craned onto your foundation.
We’ve set homes at Martis Camp

The Lake Tahoe home (2009). A 3,200+ sq ft home designed by architect Paul Warner, set on its foundation during a November snowstorm. Watch the set
The Sage Modern home (2011). A 3,250 sq ft, 5-bedroom home at Martis Camp with a factory-built basement module, so the lower level finished on the same schedule as the rest of the house. See the home
How a modular home gets approved in Truckee
- State approval at the factory. California approves factory-built homes through its Department of Housing and Community Development (HCD). Your home is inspected in our factory and carries the state insignia.
- Town building permit. The Town of Truckee reviews your site: foundation, utilities, setbacks, snow storage and fire code.
- Set and final inspection. We deliver and set the modules. The town inspects the on-site work and issues your certificate of occupancy.
Sources: California HCD Factory-Built Housing Program · Town of Truckee: Permitting Your ADU
Adding an ADU in Truckee
- ADUs are approved by right, with no public hearing. The town must decide within 60 days of a complete application.
- Size limits: up to 850 sq ft for a studio or 1 bedroom, and up to 1,000 sq ft for 2 or more bedrooms. On single-family lots of 1 acre or more, up to 1,200 sq ft. Setbacks, height and site coverage can lower the limit on your lot.
- Junior ADUs inside the main home can be up to 500 sq ft.
- ADUs of 750 sq ft or less skip impact fees under state law.
- A deed restriction is recorded before occupancy. It bars selling the ADU separately and renting it for less than 31 days.
- Plan parking on your lot. Parking on town roads is banned every year from November 1 to April 30 for snow removal.
Sources: Truckee Development Code 18.58.025 · Town of Truckee: Winter parking ban (Code 10.17.030)
Floor plans to start with
Ask us which plans can be engineered for your lot’s snow load. You choose the finishes.
From your lot to move-in
- Tell us about your lot. Land, size and budget. We’ll call you.
- Site and delivery review. We check the plans that fit, your permit path and your delivery cost to Truckee.
- Build and set. The factory builds while your site work runs. Then we deliver and set.
Questions people ask about building in Truckee
Can I put a modular home on my lot in Truckee?
Yes. California treats factory-built homes like site-built homes once they’re set on a permanent foundation. The town reviews the foundation, utilities and site. The house itself is approved by the state.
Can a modular home handle Truckee snow?
It has to meet the same snow load as any home on that lot, from 170 to over 480 pounds per square foot. We plan each home around your lot’s load.
How big a home can I build in Truckee?
A single-family home plus its garages and accessory buildings can total up to 7,500 sq ft of floor area on one parcel. ADUs can be exempt from that cap. Source: Truckee Development Code 18.08.070
How big can an ADU be in Truckee?
Up to 850 sq ft for a studio or 1 bedroom, 1,000 sq ft for 2 or more bedrooms, and 1,200 sq ft on single-family lots of an acre or more.
Can I rent out an ADU as a vacation rental?
No. Truckee bars ADU rentals of less than 31 days.
How long does it take?
Most of the wait is getting your land and permits ready, and that depends on your city or county. The factory build is the shorter part. We’ll give you a realistic timeline for your lot on the call.
How do people pay for a modular home?
Most buyers use a construction loan. We work with lenders who know modular loans.
Local rules on this page were checked in November 2026. Rules change, so we confirm the current ones for your lot on the call.
More in California: Los Angeles · Bay Area · San Diego · Modular homes in California · All locations
Irontown Modular · Building since 1984 · 70,000 sq ft factory in Spanish Fork, Utah · 551 quality checks per module · All locations
