What can you build in the Bay Area?
Factory-built homes and ADUs for Bay Area lots, built indoors and set on your foundation. Building since 1984.
Homes are built indoors in Spanish Fork, Utah, then delivered and set on your lot. See what fits my lot
We’ve built in Los Altos

Los Altos (2010). We built and delivered a LivingHomes design by architect Ray Kappe: a three-unit building with two 2-bedroom townhomes and a studio. It earned LEED Platinum. See the project · Watch the video
Every Bay Area city sets its own rules
The Bay Area is dozens of cities. Each one sets its own ADU size, height and setback limits inside state law. We check your city’s rules before we quote.
We build your home inside our 70,000 sq ft factory while your foundation and utilities go in. Each module passes 551 quality checks before it leaves. Then it’s delivered and craned onto your foundation.
How a modular home gets approved in the Bay Area
- State approval at the factory. California approves factory-built homes through its Department of Housing and Community Development (HCD). Your home is inspected in our factory and carries the state insignia.
- City building permit. Your city reviews the site: foundation, utilities, setbacks and local fire rules.
- Set and final inspection. We deliver and set the modules. The city inspects the on-site work and issues your certificate of occupancy.
Sources: California HCD Factory-Built Housing Program
Example: ADUs in San José
- Detached ADUs can be up to 1,000 sq ft on lots up to 9,000 sq ft, and up to 1,200 sq ft on larger lots.
- San José keeps a list of preapproved ADU vendors on its ADU page.
Sources: City of San José: ADUs · City of San José: ADU rule changes and preapproved ADUs
State rules that apply in every Bay Area city
- Cities must approve a qualifying ADU by right, within 60 days of a complete application.
- ADUs of 750 sq ft or less skip impact fees.
- SB 9 lets you build two homes on many single-family lots, or split the lot in two.
Sources: California HCD: ADUs · California HCD: SB 9 Fact Sheet
Floor plans to start with
Ask us which plans fit your city’s ADU limit. You choose the finishes.
From your lot to move-in
- Tell us about your lot. Land, size and budget. We’ll call you.
- Site and delivery review. We check the plans that fit, your permit path and your delivery cost to the Bay Area.
- Build and set. The factory builds while your site work runs. Then we deliver and set.
Questions people ask about building in the Bay Area
Can I add an ADU anywhere in the Bay Area?
California requires cities to allow ADUs on lots zoned for homes. Size, height and setbacks vary by city, so we check yours first.
How big can an ADU be?
It depends on the city. In San José, it’s 1,000 sq ft on lots up to 9,000 sq ft and 1,200 sq ft on larger lots.
Can I build two homes on my lot?
Often, yes. SB 9 allows two homes on many single-family lots, or a lot split. Historic districts and some hazard areas are excluded.
Is a modular home the same as a manufactured home?
No. A modular home is built to the same California building code as a site-built home and sits on a permanent foundation. A manufactured home is built to a federal HUD code.
How long does it take?
Most of the wait is getting your land and permits ready, and that depends on your city or county. The factory build is the shorter part. We’ll give you a realistic timeline for your lot on the call.
How do people pay for a modular home?
Most buyers use a construction loan. We work with lenders who know modular loans.
Local rules on this page were checked in November 2026. Rules change, so we confirm the current ones for your lot on the call.
More in California: Los Angeles · San Diego · Truckee · Modular homes in California · All locations
Irontown Modular · Building since 1984 · 70,000 sq ft factory in Spanish Fork, Utah · 551 quality checks per module · All locations
